Site

Did you mean
klass ditches

Search results

  1. Surface applied nutrients are exposed to loss from rainfall after application

    https://agbmps.osu.edu/scenario/surface-applied-nutrients-are-exposed-loss-rainfall-after-application

    runoff to the ditch can occur. 2. Surface water can move to surface drainage features such as surface ...

  2. Critical Concerns

    https://agbmps.osu.edu/critical-concerns

    deposited as the water slows in the water course (ditch, stream, or river). Removal is required to maintain ... Ditch/Streambank Collapse adds sediment downstream Channel Bed Stabilization Stream Bank Stabilization Riparian ... Forest Buffers Open Channel/Two-Stage Ditch Surface water leaving via field edge or tile risers results ...

  3. Water Control Structure (NRCS 587)

    https://agbmps.osu.edu/bmp/water-control-structure-nrcs-587

    elevation of water in drainage or irrigation ditches include checks, flashboard risers and check dams. Other ... as installation of a structure in a ditch, a permit might be required. Sizing and installing ...

  4. References used in BMP pages

    https://agbmps.osu.edu/references

    Constructed Two-Stage Ditches.” Journal of the American Water Resources Association 51, no. 4 (2015): 910–922. ... of Two-Stage Ditches with Constructed Floodplains on Water Column Nutrients and Sediments in ... Tank, Sarah S. Roley, and Robert T. Davis. “Two- Stage Ditch Floodplains Enhance N-Removal Capacity and ...

  5. Inter-rill and rill erosion

    https://agbmps.osu.edu/scenario/inter-rill-and-rill-erosion

    develop gullies and exit the edge of the field, thus causing sediment deposition in ditches, streams, and ...

  6. 2021 Overholt Drainage Workshop

    https://fabe.osu.edu/events/2021-overholt-drainage-workshop

    – Ohio’s “petition ditch laws” that address the installation and maintenance of drainage works of ...

  7. Stream Bank Stabilization (NRCS 580)

    https://agbmps.osu.edu/bmp/stream-bank-stabilization-nrcs-580

    barbs/bendway weir Other measures are floodplain establishment measures, such as two-stage ditches and ... a stream or ditch. Shoreline stabilization measures are often associated with preventing and reducing soil ...

  8. Wood Chip Bioreactor (NRCS 605)

    https://agbmps.osu.edu/bmp/wood-chip-bioreactor-nrcs-605

    water at the edge of a field prior to the water entering a ditch or a stream. Bioreactors do not ...

  9. Grassed Waterways (NRCS 412)

    https://agbmps.osu.edu/bmp/grassed-waterways-nrcs-412

    as shallow, grassed field ditches that collect runoff from furrows and areas in fields that slope ...

  10. Blind Inlet (NRCS 620)

    https://agbmps.osu.edu/bmp/blind-inlet-nrcs-620

    sediment, nutrients, and other contaminants that would otherwise be transported to receiving ditches or ...

Pages